The objective is to
inform the implementing agency of disaster risks and measures to mitigate the
potential impact for the proposed Hanoi Metro Line 5 (Line 5) project during
the feasibility study and project preparation phase. The proposed project will
focus on areas such as general metro design, addition of the Network Operation
Control Center (NOCC), and integrated planning of the metro line and urban
development.